New Search

If you are not happy with the results below please do another search

3 search results for:

1

Ballston Pond Retrofit

During the construction of I-66 through Arlington County in the early 1980’s, a detention pond was constructed to control runoff from I-66 for storms up to the 100-year storm. Over time, the pond became silted in and overgrown with invasive plant life.  Arlington County sought to restore the pond and bring it back to its […]

3

Urban Stream Design for Interactivity

At the root of much debate surrounding ecosystem restoration projects is whether we are restoring to a condition solely for natural habitat or whether the restoration should be designed for human interaction.  Considering these perspective, as well as the future needs at the project site,  are important when determining site-specific design objectives.  Many streams throughout […]