Ballston Pond Retrofit
During the construction of I-66 through Arlington County in the early 1980’s, a detention pond was constructed to control runoff from I-66 for storms up to the 100-year storm. Over time, the pond became silted in and overgrown with invasive plant life. Arlington County sought to restore the pond and bring it back to its […]